The test assistance time is shortened several times, The number of personnel is reduced exponentially, and the test site occupation is reduced
Core upgrades and innovation points:
1. Integration of UHV resonant reactor and voltage divider;
2. Huadian's original fusion pressure measurement system based on inductance partial pressure;
3. Special structure single-section 600kV/12A reactor.
4. Integrated series resonance inductance voltage divider high-voltage measurement system